Skip to product information
1 of 10

WINNES

WINNES GPS Tracker 4GTK806 Real-time location with Remotely cut off and return oil with ACC detection function GPS Locator for Car

WINNES GPS Tracker 4GTK806 Real-time location with Remotely cut off and return oil with ACC detection function GPS Locator for Car

Regular price $88.00
Regular price $110.00 Sale price $88.00
Sale Sold out
Shipping calculated at checkout.
Quantity


About this item

★【Real-time and Precise Positioning】: Working based on GSM/GPRS network and GPS satellite positioning system, you can get the location of your car via SMS/APP/PC.

★【Cut and Resume Oil Power Remotely】: If the car is stolen, the mobile phone will immediately receive an alarm. Through the one-key cut-off function, the vehicle can not be driven normally, and you can earn precious time to find your car.

★【ACC Alarm】: After the orange wire is connected to the car ACC wire, if the ACC alarm is set, then when the car ignition starts, it will send "ACC On" to the administrator number and SOS number via SMS!

★【Geofence】: Set up a safe area for the tracker device to restrict its movement in this area. When the tracker enters and leave this area, you will receive an alarm.

★【Wide Applications】: It has a wide operating voltage DC9V-95V, which covers most of the vehicles on the market. It is specially designed for vehicle, such as car, motorcycle, truck, etc.

Feature

  1. LTE/4G: LTE-FDD: B1/B2/B3/B4/B5/B7/B8/B28/B66

        GSM850/900/1800/1900MHZ four-band system is universal;

  1. Ultra-wide working voltage input range: 9-95V DC;
  2. GPS continuous positioning, GPRS regular reporting;
  3. Built-in vibration sensor to realize the intelligent anti-theft of the vehicle;
  4. ACC ignition signal detection, vehicle status prompt;
  5. It can be connected to the oil and electricity relay to realize remote control of the vehicle;
  6. A specific number can be set for anti-theft alarm;
  7. Built-in backup battery to realize illegal trimming alarm.

 

Parameter

GPS accuracy: 5m
Host weight: 26.6g 
Network: GSM/GPRS
GPS sensitivity: -159dBm
Shell material: ABS plastic
Host size: 82 mmX38mmX1 8mm
Built-in battery: 80 mAh (3.7V polymer battery)

Packaging

✔1*Locator host

✔1*4P power cord

✔1*relay+wiring harness

✔1*Instruction

Certificate(CE/FCC/MSDS)


11 years experience of OEM and ODM service,All our equipment has obtained CE and FCC certification, and the quality is safe and reliable.

Warranty

 

1.All products have been strictly Quality Checked in house before packing.

2.All products have been well packed before shipping.

3.One year warranty is provided for all models.We will bear maintenance cost during warranty.

Delivery

 

1.Sample and small order will be delivered within 2-3 working days after the receipt of payment.

2.For order over 500pcs or customized order,lead time will be 8-10 days after the receipt of payment.Please contact our sales to make sure the current inventory.

Access platform URL: www.mytkstar.net/  / APP: WINNES GPS

              


View full details